Various Recent Projects

Henley Theatre Services is committed to achieving delivery of all our installations and projects on time and on budget.

For a discussion about your project or to arrange a site visit please get in touch with our team on 01491 412347 or by sending an email to reg@henleytheatre.com

HEATHFIELD ST MARY’S SCHOOL, ASCOT, BERKSHIRE (£155,000) 2017

Design, supply and installation of complete performance systems package for new Arts Centre completed in June 2009.  HTS was retained by the School from the earliest stages to work with Tooley & Foster Partnership and their electrical and mechanical services engineers to develop the design of all specialist elements for the theatre, drama studio and ancillary spaces.  Theatre rigging includes 6 Centre Stage triband motorised hoists together with all fixed suspensions and tracks.  The stage lighting system is based on 72 hard-wired Strand Wallrack dimmers, together with 12 non-dim channels.  Lighting control is a Strand Palette 48/96 desk with lanterns from ETC, Strand and Selecon.  The sound system incorporates a Mackie Onyx 16 channel mixer, four ElectroVoice Zx4 full range

loudspeakers, two Zx4 foldback loudspeakers, together with complementary facilities and infrastructure.  Communications includes Techpro ring intercom and show relay facilities.  Stage and window draperies for the theatre are also included.  The Dance Studio has straightforward lighting, sound and barrel grid reusing much of the School’s existing equipment.  A scaffold tower and Zarges ladder are also provided.

ST ANDREWS SCHOOL, WOKING, (£90,000) 2018/2019

Supply and installation of complete performance systems package for a new Theatre scheduled for completion January 2019.  HTS was retained by the School from the earliest stages to work with the Darwin Group and their electrical and mechanical services engineers to complete the specialist elements for the theatre. Theatre rigging includes internally wired lighting bars together with all fixed suspensions and tracks.  The stage lighting system is based on 48 hard-wired Zero 88 bypass dimmers, together with 12 non-dim channels.  Lighting control is a Zero 88 FLX.  The sound system incorporates a ElectroVoice full rangeloudspeakers, two Zx4 foldback loudspeakers, together with complementary facilities and infrastructure. 

Communications includes Techpro ring intercom and show relay facilities.  Stage draperies for the theatre are also included.

RIVER & ROWING MUSEUM, HENLEY-ON-THAMES, 2019

This very prestigious space at the river & rowing museum is used for weddings, parties and launches, our very own Henley Festival announced the 2019 line up earlier this year.  

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *